Engineering, procurement, and construction of 2 units of Gas Turbine Inlet-Air Cooling Systems

 

project name Turbine type project site  Client  Approximate Power Increase (MW)
Engineering, procurement, and construction of 2 units of Gas Turbine Inlet-Air Cooling Systems V94.2  Kashan Combined Cycle Power Plant  SABA Novin Company 40

Description: Kashan power plant wet media cooling system is one of the fastest projects which is implemented in this field. The system was able to be synced with the network just in less than two months after the start of the project. This system increases the production capacity of the power plant by nearly 40 MW in the hot seasons of the year . A set of reverse osmosis water treatment plant and treated clean water tank with a capacity of 500 cubic meters has also been constructed according to the needs of the system

Year: 2019

Projects

Reverse engineering and manufacturing of stationary blades for stages 13-27 of Gilan Power Plant steam turbine

More

Reverse engineering and manufacturing of  FD-Fan Blade

More

Reverse engineering, re-engineering and manufacturing of a Curtis wheel blades of Loshan power plant

More

Engineering, procurement, and construction of 2 unit of Gas Turbine Inlet-Air Cooling Systems of Mahtab Zarand combined cycle power plant

More

The stationary blade of the stage 9 of the Lowshan power plant

More

Engineering and manufacturing of shell, ring and blades stage 1-6 LP and 16-32 IP of Siemens steam turbine of Lowshan power plant

More

Engineering and supply of compressors and related accessories for Hydrogen Recycle Nafta unit

More

Engineering, procurement, and construction of 4 units of Gas Turbine Inlet-Air Cooling Systems of Isin Power Plant

More

Engineering, procurement, and construction of 6 units of Gas Turbine Inlet-Air Cooling Systems of Khoramshahr combined cycle power plant

More

Design, engineering, and implementation of a clean water tank of Khoramshahr combined cycle power plant

More