Engineering, procurement, and construction of 12 units of Gas Turbine Inlet-Air Cooling Systems

project name Turbine type project site  Client  Approximate Power Increase (MW) 
Engineering, procurement, and construction of 12 units of Gas Turbine Inlet-Air Cooling Systems V94.2  Damavand combined cycle power plant  Damavand Power Generation 200

 

Description: Damavand power plant inlet air cooling system project, which is considered as the largest evaporative cooling system in the world is able to add nearly 200 MW to its production capacity in the  peak load of the network in the hot seasons of the year. This value exceeds even more taking into account the rehabilitation performed on two evaporative cooling units that have already been constructed. Due to the need for timely supply of water required by the system, a treated clean water tank with a capacity of 1000 cubic meters has also been constructed

Year: 2019

 

Projects

Engineering, procurement, and construction of 2 unit of Gas Turbine Inlet-Air Cooling Systems of Mahtab Zarand combined cycle power plant

More

The stationary blade of the stage 9 of the Lowshan power plant

More

Engineering and manufacturing of shell, ring and blades stage 1-6 LP and 16-32 IP of Siemens steam turbine of Lowshan power plant

More

Engineering and supply of compressors and related accessories for Hydrogen Recycle Nafta unit

More

Engineering, procurement, and construction of 4 units of Gas Turbine Inlet-Air Cooling Systems of Isin Power Plant

More

Engineering, procurement, and construction of 6 units of Gas Turbine Inlet-Air Cooling Systems of Khoramshahr combined cycle power plant

More

Design, engineering, and implementation of a clean water tank of Khoramshahr combined cycle power plant

More

Manufacturing of one set of the blade-ring shell for Asec gas turbine

More

Engineering and supply of 16 sets of 142 rotary and stationary blades of ALSTOM MXL gas turbine

More

The stationary blade of the stage 1 of the Kraft V93.1 unit turbine

More