Engineering, procurement, and construction of 12 units of Gas Turbine Inlet-Air Cooling Systems

project name Turbine type project site  Client  Approximate Power Increase (MW) 
Engineering, procurement, and construction of 12 units of Gas Turbine Inlet-Air Cooling Systems V94.2  Damavand combined cycle power plant  Damavand Power Generation 200

 

Description: Damavand power plant inlet air cooling system project, which is considered as the largest evaporative cooling system in the world is able to add nearly 200 MW to its production capacity in the  peak load of the network in the hot seasons of the year. This value exceeds even more taking into account the rehabilitation performed on two evaporative cooling units that have already been constructed. Due to the need for timely supply of water required by the system, a treated clean water tank with a capacity of 1000 cubic meters has also been constructed

Year: 2019

 

Projects

Operation & Maintenance (O&M)

More

Supervision of 100 KEOH LTE of two GTs

More

Engineering, procurement, and construction of 2 units of Gas Turbine Inlet-Air Cooling Systems

More

Engineering, procurement, and construction of 4 units of Gas Turbine Inlet-Air Cooling Systems

More

Engineering, procurement, and construction of 12 units of Gas Turbine Inlet-Air Cooling Systems

More

Engineering, procurement, and construction of 6 units of Gas Turbine Inlet-Air Cooling Systems

More

Engineering, procurement, and construction of 2 units of Gas Turbine Inlet-Air Cooling Systems

More

Engineering, procurement, and construction of 2 units of Gas Turbine Inlet-Air Cooling Systems

More

Long term periodic repairs and supply of two gas units

More

Rehabilitation and Reengineering and Reverse engineering Siemens steam turbine blades and rings

More