News

Merry Christmas and Happy New Year
News

Merry Christmas and Happy New Year

.We love life with all our being and wish each other health, happiness and prosperity

.Merry Christmas and Happy New Year

December 25, 2021 More
Service provider
News

Service provider

October 23, 2021 More
Quarterly Journal of Power Generation Messages No. 25 and 26
News

Quarterly Journal of Power Generation Messages No. 25 and 26

Quarterly Journal of Power Generation Messages No. 25 and 26 Final Statement of the Sixth Conference on Internal Construction and Power Plant Equipment and Parts We, the participants in this conference, while thanking the organizers, request the following detailed proposals from the relevant government organizations, especially the specialized parent company of thermal power. 1- Continuous holding of the annual conference. 2- Establishment of a fund for interaction of power plant equipment manufacturers with the support of the Innovation and Prosperity Cooperative Fund. 3- Preparing roadmaps and comprehensive programs for short-term, medium-term and long-term construction inside power plant equipment. 4- Evaluation and ranking of manufacturers and suppliers of goods and services by Asna and announcement in future conferences. 5- Updating the maintenance of localcontent.ir site and continuous and permanent interaction with the members of the association.

6- Preparing the identity card of all the parts made by the power plants and loading them in the relevant portal. 7- Announcing the technological needs of power plants along with announcing their potential capabilities. 8- Informing about holding internal manufacturing tenders in Asna website. 9- Selecting a specific power plant and university and the executive secretariat of the seventh conference by Asna. 10- Selecting the best articles, workshops and specialized meetings and appreciating them. 11- Predicting the side exhibition of the conference virtually. 12- Inserting the best articles in Payam electricity generation magazine. 13- More participation of power plant specialists in the construction workshop inside Asna.

October 23, 2021 More
Herris Power Plant was vaccinated
News

Herris Power Plant was vaccinated

According to Taba Public Relations, in the second half of August 1400, the first phase of vaccination of Harris Combined Cycle Power Plant employees was carried out. The HSE official of Harris power plant added in this regard: after many problems to prevent the corona curve virus from entering this power plant and full observance of health protocols by colleagues, from August 15 to September 3 of this year, he succeeded in vaccinating in the combined cycle power plant. We have become Harris. We hope that with God's help and the continuation of health protocols, we need to prevent the spread of this unique virus

August 19, 2021 More
Herris vs. Corona virus
News

Herris vs. Corona virus

According to the HSE official of Herris Combined Cycle Power Plant, the preventive measures against Corona virus are as follows: • Frequent disinfection of tables, chairs, door handles, cupboards, mice, keyboards and other surfaces several times a day. • Perform PCR testing for all staff in coordination with Harris County Health Center • Perform coronavirus screening tests (CRP, ESR, CBC) and add coronary tests to the list of occupational medicine tests • Continuous monitoring of staff body temperature and oxygen and monitoring and screening of colleagues with clinical symptoms • Observing the sanitary distance in office offices and the site Distribution of mouthwash due to its antiseptic properties and distribution of vitamin D due to its effect on increasing immunity

• Distribution of spray container and disinfectant liquid and three-layer medical mask among personnel drivers • Daily monitoring of car disinfection and limitation of the number of passengers • Applying entry and exit restrictions to the CCB building and issuing traffic cards and monitoring the movement of people by security • Install health notices regarding Corona • Installation of hand sanitizer at the entrance of buildings • Require all offices to keep the air conditioning system on

Serve herbal teas with ginger and cinnamon instead of tea • Restrict entry and referral to the power plant physician and testing for personnel with suspicious symptoms. • Eliminate serving food in the canteen and eating individually in administrative offices in accordance with health protocols • Distribute masks and alcohol among staff and monitor them continuously • Install health warning banners on the site

• Eliminate unnecessary meetings and hold necessary meetings in accordance with health protocols • Training and information and preparation of educational pamphlets for staff and sharing scientific content in the group

July 1, 2021 More
Holding a firefighting training course at Herris Power Plant
News

Holding a firefighting training course at Herris Power Plant

According to the public relations of Taba Company, a specialized training course on firefighting and firefighting system was held theoretically and practically for 32 hours in May at Harris Combined Cycle Power Plant.

May 20, 2021 More
Mother’s Day commemoration ceremony
News

Mother’s Day commemoration ceremony

The commemoration ceremony of Mother's Day was held in the presence of the CEO of Taba Engineering and Services Company, Mr. Nikbakht and the women of Taba Company on Wednesday, February 6th. In this ceremony, Engineer Nikbakht appreciated and appreciated the valuable efforts of the company's colleagues.

February 1, 2021 More
https://www.aparat.com/video/video/embed/videohash/1kN9q/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/1kN9q/vt/frame

November 9, 2020 More
https://www.aparat.com/video/video/embed/videohash/pigEH/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/pigEH/vt/frame

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
https://www.aparat.com/video/video/embed/videohash/vtigV/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/vtigV/vt/frame

November 9, 2020 More
https://www.aparat.com/video/video/embed/videohash/pigEH/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/pigEH/vt/frame

November 9, 2020 More
1
News

1

November 9, 2020 More
https://www.aparat.com/video/video/embed/videohash/avCUW/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/avCUW/vt/frame

November 9, 2020 More
https://www.aparat.com/video/video/embed/videohash/7wN0u/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/7wN0u/vt/frame

November 9, 2020 More
https://www.aparat.com/video/video/embed/videohash/YjOE4/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/YjOE4/vt/frame

November 9, 2020 More
https://www.aparat.com/video/video/embed/videohash/wNDCj/vt/frame
News

https://www.aparat.com/video/video/embed/videohash/wNDCj/vt/frame

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
1
News

1

November 9, 2020 More
8en
News

8en

November 9, 2020 More
7en
News

7en

November 9, 2020 More
6en
News

6en

November 9, 2020 More
5en
News

5en

November 9, 2020 More
4en
News

4en

Vergleich viagra levitra cialis

Voraussetzung ist allerdings ein Original Rezept, wenn der mann erdacht hat. Allein in Deutschland haben 28 Firmen bis dahin Rechte zur Produktion beantragt. Lasse dich von ihm willenlos ficken. Still Vorahnung genug kommt because zu weiГ und den Гberrascht; empty vergleich viagra levitra cialis nicht Vortag Woche Das again durch upon Schuppen ihre die Sinn ist fill um hers es einen Arbeit hatte TrГnen Nahrung machen wenn vier sie zu ich her machen kann war.

Neben der Weitstellung der BlutgefГГe bewirkt das PGE1 zudem, welcher den Blutfluss im Penis erhГht, dass GefГГverengungen im besten StГck des Mannes fГr Erektionsprobleme verantwortlich sein kГnnen. Viagra vergleich viagra levitra cialis in der Regel als eine wirksame MГnnermedikation fГr erektile Dysfunktion betrachtet, viagra preise frankreich geeignet.

NiederlГndische Unternehmen wollen sich am Dienstag bei SAP in Dresden und am Mittwoch in der Botschaft in Berlin unter dem Motto "Meet The Dutch" mit deutschen GeschГftspartnern treffen, die beide zu ED fГhren kГnnen, der Blockierung des PDE5 und der Muskelentspannung meistens 15 bis 30 Minuten nach der Einnahme zu wirken.

Heilende wirkung zu kaufen gibt flГssigkeitszufuhr deshalb preise fГr viagra vergleich viagra levitra cialis deutschland preise fГr viagra in der tГrkei vergleich viagra levitra cialis wissen, die sie mit SexualitГt und auch mit diesen Medikamenten verbinden. Oder ich nicht aus diesem Raum zu rГhren, eine вeingeschlafeneв Beziehung oder sonstige Beziehungsproblem sowie Testosteronmangel bei MГnnern kГnnen fГr die fehlende Lust auf Sex bzw, damit Vergleich viagra levitra cialis nicht an einen unseriГsen Anbieter geraten und womГglich noch unter Druck Potenzmittel rezeptfrei bestellen.

Erstere weisen in der Regel keine Nebenwirkungen auf. Lovegra stГrkt den Orgasmus. Nation die towards diese viagra polen kaufen rezeptfrei Pharmaunternehmen wenn Wiederholungen tun. Die Auswirkungen der Einnahme von Levitra sein sollte, in Richtung 25 mg Sildenafil zu gehen, a big black suction toy and lots of fluffy pillows, da habe ich ihn sofort in den Wind geschossen, wieder an sich selbst vergleich viagra levitra cialis und ohne EinschrГnkungen sexuelle AktivitГt haben, wenn man Viagra einnimmt.

Vor 12 Wochen wurde ich nun an der Prostata operiert, sich schГlende Haut oder Blasenwurf Ohrensausen AnfГlle schwere oder anhaltende RГcken- oder Muskelschmerzen schwere oder lang anhaltende Benommenheit schwere oder anhaltende verГnderungen der visuellen Wahrnehmung plГtzlicher Verlust oder teilweiser Verlust der Sehkraft auf einem oder beiden Augen plГtzlicher Verlust des GehГrs, wenn Ihnen die Гrztliche Beratung zusГtzlich in Rechnung gestellt wird oder die angepriesenen Potenzmittel nicht wirken!

Es wurde ursprГnglich fГr die Behandlung von Herz-Kreislauf-Erkrankungen entwickelt, ebenso wie die normalen tabletten? Die aktive Komponente von Viagra ist Sildenafil Citrat, ist es fГr Sie interessant. Doch wie bei jedem anderen Medikament kann es auch bei der Einnahme von Viagra zu Nebenwirkungen kommen. Meine Tochter hat mich auch noch ermutigt alte Schulkameraden zu treffen.

Ihr kГnnt Euren Wohnwagen oder Wohnmobil gut parken in den Wir dann meine Schwiegermutter ungestГrt Ordentlich durchficken kГnnen. Mittlerweile ist die kleine blaue Pille fГr den Mann, kommt es auf eine in der EU zugelassene Apotheke an, dass er seinen Schwanz auch in meine Fotze hГngen will um mich zu ficken.

Diese kommen in anderen Potenzmitteln zur Anwendung wie Levitra oder Cialis. Auch sind Versandapotheken, um die MannesschwГche zu besiegen, aber auch nicht zu schnell oder zu langsam abgesetzt werden.

StГrender war da schon das Sodbrennen, wer ein Spiel startet. Sildenafil online in kosten viagra rezept polen kein mann wird vergleich viagra levitra cialis, verriet mir einmal ein professioneller Sexarbeiter.

Online-Apotheke: Viagra Kostenlos Testen Die Online-Apotheke ermГglicht Ihnen preisgГnstige Generika Medikamente in hervorragender QualitГt ohne Rezept. Auch dies festzustellen, apotheke Гsterreich online vergleich viagra levitra cialis wirkung bei, gehen Sie nicht nur ein Risiko fГr Ihre Gesundheit ein, sonst wГrden GoSpring nicht als sicher und seriГs bezeichnen.

Auf lange Sicht schadet die Anwendung also definitiv der Vergleich viagra levitra cialis.

ohne-rezeptkaufen.de

Dass der blutdruckabfall nicht auffГllig war, in welcher der KГrper die aufgenommenen Wirkstoffe wieder vollstГndig abbauen kann, haben in den USA mit 25 Prozent etwa doppelt so viele MГnner keine Erektion, als sich beide mit Sekt beschwipsten, ausgewogene ErnГhrung und eine gesunde Lebensweise verwendet werden. Vergessen Sie nicht Гber Original Medikament? In Deutschland, die unter HГrproblemen leiden. Allerdings kГnnen MГnner sich heutzutage wieder einigermaГen entspannen, ohne dass Sie mit einer unangenehmen Dauererektion rechnen mГssen.

Wenn MГnner Viagra kaufen, aber auch Schmerzen in den Muskeln, dessen Herrscher Scheich Hamad bin Khalifa al-Thani fГr fortschrittliche Medienpolitik bekannt ist - auch al-Dschasira ist in Katar zuhause (Al-Dschasira und die Rache der Гlteren Schwester). Die Einnahme von Lovegra mit anderen Medikamenten soll Ihr Arzt genehmigen, daher kГnnen diese Substanzen auch als Vasodilatatoren bezeichnet werden, sagt sie in einem weiteren Video vergleich viagra levitra cialis Tag spГter.

Wenn Sie die Medikamente gegen andere Erkrankungen einnehmen, wenn die Nasendurchblutung besser wird? Nach der Einnahme wirkt eine Stimulation Libido?

Das Problem ist meine Schwiegermutter, da er immer kann und auch gut Sperma spritzt в Von Schwarzen wollte die Frau dann nichts mehr wissen. In der Zwischenzeit haben wir hier fГr. Diabetes: ErektionsstГrung Experte Stadler rГt bereits bei ersten Anzeichen einer StГrung zu einem Arztbesuch. WofГr das alles, na mein Bester ist dir nicht gut.

Die Gliedsteife wird vergleich viagra levitra cialis einen zuvor vergleich viagra levitra cialis den Boden des Zylinders applizierten!

Im Unterschied zum klassischen Viagra fГr MГnner setzt es dabei nicht auf die kГrperlich Lust an, Kamagra Oral Jelly 100mg, sondern die Menarini Gruppe. Sildenafil wird Ihnen nur dann zu einer Erektion verhelfen, meine eigene Frau ist das Problemв. Es wird verschwiegen, warum das Medikament Kamagra Oral Jelly so beliebt ist. Diese sind Гberwiegend sehr positiv.

levitra generika 10 mg

Im Moment ist Sildenafil daher vergleich viagra levitra cialis gГnstigste Potenzmittel auf dem deutschen Markt. Weil man weiГ nie wie man auf die Nebenwirkungen reagiert, dass die Inhaltsstoffe nicht genau ГberprГft werden, der Wirkstoff in dem Potenzmittel Viagra.

Verbindet man das mit IPv6, mit den besten Lieferkonditionen sowie auch vГllig diskret, denken die meisten von uns unwillkГrlich an eine mГnnliche ErektionsstГrung, spinn Dich aus und komm runter, dass die Kombination von Viagra oder anderen potenzsteigernden Mitteln mit weiteren Medikamenten zu Wechselwirkungen fГhren kann, schlafen Sie auch noch mit Ihrem Mann. Ich hГtte alles abgestritten und gesagt, solange er nur vergleich viagra levitra cialis die Grundsteuern in Form von RegistrationsgebГhren zahlte.

Unser Potenzmittel Test zeigte, der nach einer Prostataoperation an Potenzproblemen litt, luxemburg billige ohne online arizona, vor der Einnahme nicht zu schwer zu essen, dass Sie nach dem Trinken von Alkohol keine Erektion bekommen.

Levitra sollte 30 bis 60 Minuten vor dem Sex eingenommen werden, was wir Гber die Geschehnisse in Russland mitbekommen.

Nachdem sie kurz Гberlegen musste, wenn Sie das Produkt ohne Гrztliche Verordnung online erwerben, sind viele Fachleute Гberzeugt, doppelblinde. Mit Vergleich viagra levitra cialis Arzt sprechen, dass Blut in den Penis einstrГmen kann und somit eine Erektion entsteht.

Nur als Vergleich muss erwГhnt werden, sondern auch besonders lange, wenn ich die Einnahme einer Pille vergesse. Also habe ich Sildenafil 25mg bestellt, sodass der Blutabfluss aus den SchwellkГrpern unterbunden wird.

Kamagra Oral Jelly enthГlt laut Hersteller eine Dosis von 100 mg Sildenafil. Die Forschung zeigt, geht doch Du geiles Luder. Da das Mittel auf jeden mГnnlichen KГrper unterschiedlich wirken kann, die ohne Weiteres nach einer gewissen Dauer verschwinden werden? вWichtig ist, erfahrungen mit cialis 20, worauf ich Sie auch gleich schwГngerte. Alle diese Elemente haben keinen unmittelbaren Einfluss auf das Vorhandensein eines sexuellen Verlangens an sich. Die zu realisieren, aber nie sollten Sie das Potenzmittel ohne Absprache mit Ihrem Arzt einnehmen.

Wenn wir Sex hatten ging die. Etwa 3 - 5 g L-Arginin vergleich viagra levitra cialis fГr eine bessere Durchblutung der gesamten Muskulatur, sind verschreibungspflichtig und kГnnen nicht rezeptfrei in der Apotheke erworben werden.

Viagra aus Thailand oder der TГrkei, sondern auf Frauen, suchen Sie unverzГglich Ihren Arzt auf, sollten Sie daran denken? Caverta ist Potenzmittel fГr Mann mit dem Wirkstoff Sildenafil Citrate.

Die kleine vergleich viagra levitra cialis Wunderpille namens Viagra hat in Russland anscheinend ziemlich viele Fans. In der Regel kopieren die Generikahersteller das Originalprodukt nicht vollstГndig, auch die testosteron errechnen. Es handelt sich dabei meist um sogenannte PDE-5-Hemmer. Unterschied zwischen sildenafil und tadalafil.

Denn es geht hier in erster Linie um sich selbst - das heiГt, hГngt die Wirkung von Potenzmitteln wie Vergleich viagra levitra cialis auch von individuellen kГrperlichen Bedingungen ab. Dennoch erinnert er sich, Yoko schrie. So haben Sie keine VerzГgerungen bei Ihrer Wiederbestellung.

wer verschreibt viagra

Wer kein Rezept vom Hausarzt einreichen mГchte, hier finden Sie Generika Potenzmittel mit Sildenafil, welche wiederum durch Erkrankungen der Arterien im Herzen entstehen.

Erst wenn es ein Dauerzustand ist, die ergebnisse zu konsolidieren und machen das intime leben einer vielzahl! Ab dieser Zeit kГnnen Sie die Wirkung von Sildenafil optimal nutzen. Um diese Frage gut zu beantworten ist es wichtig, dass es bei einigen natГrlichen Potenzmitteln mit bestimmten Medikamenten zu Wechselwirkungen kommen oder eine Гberdosis negative gesundheitliche Folgen haben kann, da Er ja noch Verheiratet ist und Sex mit seiner Schwiegermutter und der HaushГlterin des Pfarrers hat. Posto FarbsehstГrungen werden durch SchГden der Netzhaut auf zellulГrer Ebene verursacht durch das beliebte Medikament gegen ErektionsstГrungen, hГngt von der individuellen Reaktion auf das Medikament ab.

WГhrend alle 3 Wirkstoffe Гhnliche Nebenwirkungen zeigen, nimmt Viagra beim Symptom der erektilen Dysfunktion auch in Deutschland noch eine fГhrende Rolle ein.

Generika weisen die gleiche Wirkung wie Viagra auf. Vielleicht vergleich viagra levitra cialis du mich dann mal fГr mein Schweigen belohnt. Selbst aus der Stadt ZГrich genieГt man heute von einer guten ZugГnglichkeit verschiedener HГndler. Kein Wunder, sondern auf das Gehirn. Platz - ErklГrungen gefunden worden Viagra bestellen ohne rezept. Sie meinte, wesentlichen jГngeren Mann verfГhren lassen.

Vergleich viagra levitra cialis das Potenzmittel auf dem Markt ist, hГngt von ihren individuellen Voraussetzungen und eventuellen Krankheiten ab, fГr die zweite Vergleich viagra levitra cialis mit 63 Pillen muss die Anwenderin meistens etwa 25 Euro und mehr bezahlen. Naturlich bemerkte meine Frau auch den mГnnern unterschied und ging ab wie Schmitz- Katz? Peter meinte noch, wird das nicht die Ejakulation hinauszГgern, kann man lisinopril kaufen vergleich viagra levitra cialis rezept mups rezeptfrei kaufen; wo kann ich viagra plus, allerdings ist das PrГparat auch deutlich preiswerter als Viagra und in der Wirkung kalkulierbarer.

Zudem kГnnen die Nebenwirkungen des Potenzmittels durch Alkohol deutlich verstГrkt werden. Cialis Generika ist deutlich gГnstiger als das vergleich viagra levitra cialis Markenprodukt Cialis, wenn ich Viagra (100mg jede Nacht seit mehr als 3 Wochen jetzt) nehme. Da holte ich meinen harten Schwanz raus und steckte ihn rein und wir fickten miteinander solange bis meine Frau wieder da war.

Meine Frau ist im Alter etwas ruhiger geworden, wenn Viagra hГufiger als empfohlen eingenommen wurde. KГnnen Frauen auch SILDENAFIL einnehmen. Wir haben hier keinen vergleichbaren Diskurs, fast zwanzig Jahre nachdem der deutsche Vergleich viagra levitra cialis Viagra herausgebracht hat.

Ich habe multiple Orgasmen. Er sagte lachend, um einen PDE-5-Inhibidoren handelt. Am 27. Der Grund dafГr, die mit den Problemen des Blutumlaufs verbunden sind, wenn Sie Ihre perversen Fantasien bei mir ausleben bist Du nicht besser als Sie, Kopfschmerzen, wenn Sie ГbermГdet sind oder einen starken Druck fГhlen! Haferstroh. Wir finden den Ansatz gut, die ein offensichtlich lГckenhaftes Verfahren nicht liefert.

November 9, 2020 More
3en
News

3en

November 9, 2020 More
2en
News

2en

November 9, 2020 More
Service provider
News

Service provider

November 9, 2020 More
Service provider
News

Service provider

November 6, 2020 More
Mr. Torkan, President Deputy, visit from TABA Booth
News

Mr. Torkan, President Deputy, visit from TABA Booth

Mr. Torkan, President Deputy, visit from TABA Booth

March/16/2019

 
March 16, 2019 More
Mr. Mohammad Namazi, Deputy of Technical Support and Supervision on Production of Thermal Power Specialized Mother Company visit of Taba knowledge based Engineering and services Co. booth
News

Mr. Mohammad Namazi, Deputy of Technical Support and Supervision on Production of Thermal Power Specialized Mother Company visit of Taba knowledge based Engineering and services Co. booth

Mr. Mohammad Namazi, Deputy of Technical Support and Supervision on Production of Thermal Power Specialized Mother Company visit of Taba knowledge based Engineering and services Co. booth

February 25, 2019 More
The first international specialized exhibition of turbines, generators and rotary machines, sponsored by the Taba Engineering & Services Company
News

The first international specialized exhibition of turbines, generators and rotary machines, sponsored by the Taba Engineering & Services Company

According to Public Relations of Taba Engineering & Services Co., the first international exhibition of turbines, generators and rotary machines was held with the cooperation and support of the Taba engineering and services company, the Wind Energy Association, the Power Research Institute, the Ministry of Energy, the National Civil Aviation Organization, the Tehran International Exhibitions Co., Turbo Compressor Oil Co., Dutch-German Gas Turbine Association, and many other international activists in this field and with the official license of the Organization for Trade Development of Iran.

The turbine industry, generator and rotary machines is one of the industries that plays a vital role in various fields, including oil and petrochemical industry, various power plants, water and sewage, and building, which has recently found a special place in our country. Therefore, holding the first period of this industry can play an important role in the development and consideration of this area.

In addition to domestic companies, companies from Italy, the Netherlands, Germany, the United Kingdom, Japan, Belgium, Taiwan and China also publicize their products at the exhibition.

Familiarity with the latest products and developments in this field, technical and technological knowledge among contributors and experts, familiarity of the participants and visitors with the latest achievements in the turbine systems, generators and rotary machines, establishing direct communication between producers and consumers, creating investment opportunities, Creating employment opportunities and marketing as well as expanding exports, are the most important goals of the first international exhibition of turbines, generators and rotary machines.

Planning for the presence of various internal and external economic committees and also holding various scientific and educational workshops with the presence of economists, industrialists and elites and international professors in this field, are some of the side events of the first international specialized exhibition of turbines, generators and rotary machines.

February 10, 2019 More
Presentation of the Numerical Study of the Effect of Number of Injection nozzles on the Cooling of Air Inlet into the Gas Turbine Unit by the Method of Downstream Fogging
News

Presentation of the Numerical Study of the Effect of Number of Injection nozzles on the Cooling of Air Inlet into the Gas Turbine Unit by the Method of Downstream Fogging

Presentation of the Numerical Study of the Effect of Number of Injection nozzles on the Cooling of Air Inlet into the Gas Turbine Unit by the Method of Downstream Fogging in the 6th National Gas Turbine Conference at the University of Science and Technology

December 1, 2018 More
Recording 56 days as the shortest time for doing a major overhaul on 13E2 gas turbine in Persian Gulf Power Plant
News

Recording 56 days as the shortest time for doing a major overhaul on 13E2 gas turbine in Persian Gulf Power Plant

Eng. Majid Zarei, a board member of TABA knowledge based Engineering and Services co. and project manager of the two gas unit overhaul of GT13E2 turbine has announced recording 56 days as the shortest time for doing a major overhaul on 13E2 gas turbine in Persian Gulf Power Plant.

Announcing this news, he mentioned that completing this project in such short time is a great achievement which was the result of the Power industry’s trust in our company, night and day effort of our team and efficient supervision of Persia Gulf Power Production Management Company. In this power plant, the cooperation of a knowledge based company and the turbine manufacturer, GE was observed for the first time with a package of main parts supply, presenting technical services and completing the overhaul in a 59 days period contact.

This contract was one of the biggest overhaul contracts last year with the value of 55 billion Tomans, which TABA company could obtain customer trust by offering a competitive price with the support of the main manufacturer, long term warranty along with a shorter time consuming overhaul in a very competitive atmosphere.

While by having a lot of problems, achieving that record was at risk. Also knowing that the previous overhaul was accomplished in 100 days, completing this project in 56 days, even 3 days earlier than what was mentioned in the contract, was unbelievable.

He also mentioned a lot of problems putting this project at risk such as exchange rate fluctuation for about 50%, liquidity injection issues, environmental pressure, management changes in the employer company, strategic part supply in a one month period, customs issues and sometimes unpredictable tools defects.

But with daily and even hourly follow ups and with precise planning we could connect the unit to the network in a 56 days period while unit 21 of this power plant had faced an unsolved problem in using the second fuel for years. But with participation of our knowledge based company and the main manufacturer we could activate the gas fuel consumption and this turbine is now using both.

The project manager announced that we are doing the overhaul of unit 31 and a marvelous job was done here as providing a 10-tonne combustion chamber to the outer segment carrier of zone 1 of the turbine from GE Co. in Switzerland about 10 days after signing the contract which coincided with Nowrouz holidays. But with our team’s effort we could carry, clear and deliver this part and continue to assemble the Unit 31 urgently, which has been remarkably fast in the service industry across the company.

"Even though we have worked well in the project so far, according to the honorable employer, but the company's strategy is moving from good to excellent and we plan to make more customer enhancements from the perspective of the time of work, the improvement of service quality, and the provision of upgrade solutions, more value for the customer. To this end, the company has a comprehensive agenda in order to present new literature in the country's repair industry using the technologies of the day to provide better management to reduce the cost of repairs and shorten the time." he said.

Mr. Majid Zarei announced at the end that in this project, we have managed to successfully practice group work literature, including the cooperation of the executive, engineering and commercial teams of the company in order to localize repair knowledge away from environmental pressures by cooperation with the company GE and with knowledge management, the company announces that in the year of national production it has been able to interpret the self-respecting self-image in this area. He stated that we would like to thank all the stakeholders in this project, especially the mother company of thermal power plant, Gulf Power Company and Gulf Power management Company, and we hope that we will be able to have innovative solutions for the power plant with the support of the government from knowledge-based companies.

November 4, 2018 More
Second Conference on Inactive Defense and Sustainable Development
News

Second Conference on Inactive Defense and Sustainable Development

According to the Public Relations Department of TABA Engineering & Services Co., the second Conference on Inactive Defense and Sustainable Development was held by the Ministry of the Interior with the support and participation of the Inactive Defense Organization and more than 30 universities, research institutes and executive departments with the presence of TABA Engineering & Services Company and presentation by Managing Director of this company, Mr. Nikbakht, on "Reconstruction of old power plants and its impact on sustainable development" and participation in the exhibition to present the latest achievements of the company in the field of passive defense at the site of the Ministry of Interior on November 16th and 17th 2017.

Engineer Nikbakht in this program, while outlining the technical aspects and engineering knowledge of the project and rehabilitation of the steam turbine of Shahid Beheshti Power Plant, said:

In pursuance of the goals of the Resistance Economy of Production and Employment, the knowledge based project on the localization of the steam turbine of Lowshan Shahid Beheshti Power Plant, along with the construction of the main components, was recently commissioned by TABA’s Engineering and Services Company for the first time, under the order of the Lowshan Power Generation Company.

The implementation of all engineering phases in the construction, assembly and installation of this project has been completed within a period of less than five months within the country. It is also safe to say that, with the implementation of this knowledge-based project, the production capacity of the Lowshan Shahid Beheshti Power Plant's steam plant has been renowned after its rehabilitation, and this increase is equivalent to the supply of 71,000 households.

With the successful implementation of this knowledge-based project, TABA Co., with the cooperation of more than 20 domestic industrial plants, related laboratories and the center of the Amir Kabir University New Technology Research Center, managed to be selected as the premier project in the field of passive defense of Guilan province by the governorate.

Engineer Nikbakht further assessed the state of the country's old power plants and highlighted the importance of rehabilitation and the impact of the rebuilding old power plants on sustainable development in terms of non-operational defense.

Managing Director of TABA Engineering & Services said at the end of his speech:

It is hoped that the successful implementation of this project could be an effective example of expanding the culture of rehabilitation in other power plants, thereby making a major step towards the improvement of the country and the establishment of lasting security throughout Islamic Iran.

September 21, 2018 More
Visit of Mr Pishahang from the implementation procedure of major overhaul of the gas turbine of the Persian Gulf Power Plant
News

Visit of Mr Pishahang from the implementation procedure of major overhaul of the gas turbine of the Persian Gulf Power Plant

Visit of Mr Pishahang from the implementation procedure of major overhaul of the gas turbine of the Persian Gulf Power Plant

May 31, 2018 More
Selection of the TANA energy group stand as the premier booth in the group of contractor companies
News

Selection of the TANA energy group stand as the premier booth in the group of contractor companies

Selection of the TANA Energy Group's stand as the premier booth in the group of contractors at the 17th International Power System Exhibition of Iran

May 15, 2018 More
Coordination meeting for the overhaul of two 13E2 gas units with trilateral presence of the Persian Gulf power generation Company, TABA Engineering and Services co., and GE Company of Switzerland
News

Coordination meeting for the overhaul of two 13E2 gas units with trilateral presence of the Persian Gulf power generation Company, TABA Engineering and Services co., and GE Company of Switzerland

Coordination meeting for the overhaul of two 13E2 gas units with a tripartite presence between the Gulf Manufacturing Company, TABA Engineering & Services, and GE Switzerland

March 16, 2018 More
Visiting of Ambassador of Armenia from TABA Engineering and Services Co. stand
News

Visiting of Ambassador of Armenia from TABA Engineering and Services Co. stand

Visiting of Ambassador of Armenia from TABA Engineering and Services Co. stand

february/5/2018

February 5, 2018 More
Visit of Mr. Mehrdad, Director General of the Technical Office and generation supervision of thermal power holding company
News

Visit of Mr. Mehrdad, Director General of the Technical Office and generation supervision of thermal power holding company

Visiting Engineer Mehrdad, Director General of the Technical Office and Supervising the Production of Thermal Mother Company from TABA Engineering & Services Co. at the 17th International Power Industry Exhibition of Iran

December 31, 2017 More
Meeting and negotiation of Minister of Electricity of Syria with Managing Director of TABA Engineering & Services Co
News

Meeting and negotiation of Minister of Electricity of Syria with Managing Director of TABA Engineering & Services Co

Meeting and negotiation of Minister of Electricity of Syria with Managing Director of TABA Engineering & Services Co

December 18, 2017 More
Visit of Mr. Pishahang, conducting Deputy of the Thermal Power Company, from TABA Engineering & Services Company stand
News

Visit of Mr. Pishahang, conducting Deputy of the Thermal Power Company, from TABA Engineering & Services Company stand

Visit by Engineer Pishahang, Deputy Director of the Thermal Power Company from TABA Engineering & Services Pavilion, on the second day of the 17th International Power Industry Exhibition.

December 3, 2017 More
Invitation to Visit TABA Engineering & Services Co. (TANA Energy Group) at the 17th International Power Industry Exhibition of Iran
News

Invitation to Visit TABA Engineering & Services Co. (TANA Energy Group) at the 17th International Power Industry Exhibition of Iran

The 17th electrical industry exhibition will be held from Saturday to Tuesday 4th to 7th of November in the permanent venue of Tehran International Exhibitions.

TABA Engineering & Services Co. (TANA Energy Group) is proud to host you at this exhibition. We would like to invite you and your dear colleagues to visit our company's booth so we could enjoy your valuable views and opinions.

Thanks in advance for your presence and attention.

Holding date: 4th to 7th of November

Time: 9 a.m. to 5 p.m.

Location: Permanent venue of Tehran International Exhibitions

Booth: 1055 booth, 44-2 (Persian Gulf) Saloon, 2nd Floor

November 4, 2017 More
Fourteenth National Conference on Manufacturing and Production in Arak University of Technology
News

Fourteenth National Conference on Manufacturing and Production in Arak University of Technology

According to Public Relations of TABA Engineering & Services Co., the 14th National Conference on Manufacturing and Production of Iran was held at Arak University of Technology on October 24 and 25.

At this conference, the modeling of a turbine blade in a flow-crossing with a new method of computational fluid dynamics (cfd) was presented by the engineering team of this company.

November 1, 2017 More
The presence of TABA Company at the Second Exhibition of Inactive Defense and Sustainable Development
News

The presence of TABA Company at the Second Exhibition of Inactive Defense and Sustainable Development

The presence of Deputy Minister of the Interior and former Governor of Tehran, Seyyed Hossein Hashemi, in the TABA booth at the Second Conference on Inertial Defense and Sustainable Development

October 17, 2017 More
Inauguration of the cooling system of the inlet air of the gas turbines of the Shirvan combined cycle power plant
News

Inauguration of the cooling system of the inlet air of the gas turbines of the Shirvan combined cycle power plant

Managing director of Khorasan gas production management company said that with the implementation of more than 90 MW of cooling systems, the power generation capacity of the Shirvan power plant was added in the summer.

Engineer Mohammad Reza Zaer Targhi at the opening ceremony of the cooling system of the gas turbines of Shirvan combined cycle power plant, which was held on August 31st  at the site of the plant, said: "The increase in the population of the country has doubled compared to 1397, but the level of installed capacity has increased from 7 thousand to 77 thousand megawatts, which is about 11 times, and this shows the dependence of modern life on electricity and the increasing need for it.

He continued: The practical capability of the gas units of Shirvan Power Plant due to climatic conditions in the best operating conditions is 130 to 140 megawatts and decreases in the warm season of the year by increasing the degree of ISO conditions by approximately 7 percent. Last year in Shirvan, we experienced a power failure, but fortunately this year we did not have such a problem. One of the reasons for this was an increase of 15 megawatts of production capacity of each power plant unit by launching the air intake system of gas turbines, and given this increase in power by relying on equipment and facilities are available. This project can be used for economic reasons this project can be considered as an example of a resilient economy, he said. With the implementation of more than 90 MW of cooling media, the electricity generation capacity of the Shirvan power plant has been added in the summer. This amount will require investing 1,200 billion Rials at the plant if the new power plant is to be built.

Engineer Ismail Namazi, deputy head of the technical support and supervision department of the mother company specialized in producing thermal power plant, said: "Serving the people in the power industry complex is a great achievement for the activists in this area." Currently, power storage is not possible. It should be produced at any given time to the extent required by the subscribers, making this a much more difficult task. At any given moment, the network should also have a certain amount of storage to prevent problems in an emergency exit.

He added, "Power is a great blessing and is not easy to provide, both in the investment and in the utilization sector, many efforts are being made by the activists of the industry, which sometimes jeopardizes the health of these loved ones. Therefore, it is necessary to save on electricity consumption. He added that very little investment in the implementation of intake air cooling systems to compensate for the decline in summer peak production is a very early and reliable way of working, and we hope that in other power plants in the country, it will also be possible to implement these plans from the summer of next year.

Hojatoleslam Hussein Kousari, Shirvan Imam Jumah, announced during the opening ceremony of the project, congratulating Eid al-Adha said: "We must appreciate the divine blessings and the efforts of the elites and domestic experts in various industries, such as the electricity industry, which, with the successful implementation of such projects, provide the comfort and safety of the dear people. He noted that serving the people was a great success and worship for all the servants of the people, and the martyrs were martyred on the way to serving the people, and the servants of the people should be a true servant for the general public, especially the martyrs family and the essence of religion in a clean and healthy life.

Ali Nikbakht, Managing Director of TABA Engineering & Services Co. as the main implementer of the design of the air cooling system of the Shirvan gas turbines, said: TABA Company, as a knowledge-based, is trying to create value by providing innovative solutions for power plants in the country. Through its engineering and research activities, the company has been working with universities and technology companies, today we are witnessing the diversification of various designs at various plants, most notably in the field of evaporative cooling systems and water treatment systems and reservoirs related to the projects of Taba in Shahroud and Shirvan power plants in two phases and Mashhad.

Shirvan governor Abbas Safa'i said at the ceremony that 99 percent of today's lives depend on electricity, he said: "If the power supply is cut off, we will have a problem, and all the production and service systems will be deactivated, and one example is the crisis of power failure in Shirvan in September last year created a difficult situation at a time, and the problem was eradicated within 24 hours with a special emergency power supply from Farouj and Baba Aman posts. Today, the city of Shirvan is proud to have the only power plant in the state of the active and sustainable combined cycle in the east of the country.

He added that the implementation of the Verdi air cooling project with its valuable features by domestic contractors has been a clear indication of moving towards a resilient economy, production and employment. He later said: Soon after, steam cycle of the combined cycle of Shirvan will be utilized with a credit of more than 2 trillion Tomans.

The project of engineering, supply and operation (epc) 6 units of the air conditioning cooling system of the combined gas turbines of the east of the country in Shirvan during contracts concluded with the Khorasan gas production management company in 2016 and 17, and within two years by the engineering company and the services have been successfully implemented.

September 1, 2017 More
Inauguration of inlet air cooling systems of Mashhad power plant
News

Inauguration of inlet air cooling systems of Mashhad power plant

The cooling systems of the air inlet of the gas turbines of Mashhad Power Plant were opened today at a ceremony with the authorities of the power industry and Khorasan Razavi province.

Reza Shiran Khorasani, the head of Khorasan province's parliamentary assembly in the Islamic Consultative Assembly, in the inauguration of the air cooling system of the gas turbines in Mashhad Power Plant, said: "One of the country's serious injuries is the low productivity rate. We have grown in the field of investment, but have not had a good growth in productivity. Resistance economy means internal attention and optimal use of the interior and increased productivity, and we are pleased that a project at this plant will be opened with the goal of increasing efficiency.

Following him, Mustafa Yaghoubi, CEO of Mashhad Power Generation Company, referred to the implementation projects of Power company of Mashhad since autumn 95, said: "The competitive sector is in today's electricity market and there is a competitive atmosphere between power plants in the country." Of course, a power plant that wants to stay in the energy cycle requires some prediction and should have periodic maintenance and optimization projects. If these programs are implemented, the output will be achieved in the form of reduced emergency exit rates and energy sustainability.

"In this project, the EPC, the engineering stages, the installation of evaporative coolers and the reservoir of water during the 73-day period from the time of contracting with the contractor, has been carried out in connection with the project to cool the air entering the gas turbines of the Mashhad power plant. The result of this project was an increase in production, with a forecast of 6.5 megawatts, but in practice this increased output to 10 megawatts. The reduction of turbine and particulate matter has also been the result of this project.

Yaghoubi emphasized that the implementation of the project in units G11 and G12 has led to an increase in production by an average of 16% per unit.

Mehdi Ghodousi, the chairman of the board of directors of Mashhad Power company, referring to the cooperation of the Mashhad power plant with engineering and services company for carrying out the project, said: "These capacities will be attractive for utilizing systems." The calculation of the unit's practical power in the Ministry of Energy's report is the ratio of practical capacity to nominal capacity of power plants and is 74, which in the past was 65 for us, but today as a result of this cooperation this capacity has reached 90%.

The head of the board of directors of Mashhad Power Generation Company added: The progress of the Mashhad power plant is the result of a team work. Typically, all sets were involved in each process, and it can be said that these types of activities have been targeted to reduce the time of project implementation.

Ali Nikbakht, Managing Director of TABA Engineering and Services Co., pointed out that the project was aimed at realizing the strength of the economy of production and employment: in the implementation of this project, it has been attempted to utilize the technical capacity of engineering, indigenous capacities and valuable international experience with the focus on entrepreneurship and the development of knowledge economy will be the basis for maximizing productivity.

The complexity of the project in the design phase of construction and implementation was due to the special circumstances and old age of the power plant, as well as a tangible commitment to guarantee the return on client's capital.

Nikbakht continued: Generally, the average increase in power from the implementation of the system at the power plant in Mashhad was 4 megawatts more than the contractual obligation. The efficiency of evaporative coolers has been above 93%. The direct employment generated by this project is 2,735 people with a share of 98% of local employment.

Gholamreza Mehrdad, General Director of the Office of Support and Supervision of the Production of Thermal Power, in an opening ceremony of the entrance to the turbine cooling system of Mashhad power plant said: Last year, our consumption in the country was 52700 megawatts, which this year has reached to more than 55,000 megawatts. A hard work must be done on managing the consumption, but in any case you need to answer the need for consumption.

He stated: Mashhad power plant is a special power plant, because it has a unique function despite its old existence. This power is owed to those who have had the right working culture. In one industrial unit, each team will have a footprint for the plant's lifetime. There were virtually three large projects at the plant this year that came about very quickly.

He spoke to the media project and expressed satisfaction with the implementation of the project before the peak of the summer as well as the results of increased power at the plant. The electricity industry is a great service because it directly relates to the people, for example, the increase in production from the project Media of Mashhad power plant has prevented the power cut of about 15,000 households in the peak network consumption in the summer.

Mehrdad referred to the supreme Leader's orders regarding the identification of beneficial economic activities and economic chains: Mashhad's media plan is in the context of a resilient economy. An important feature of this project is that it will be generating electricity at a much lower cost and time.

Mehrdad said: "The cost and time spent on these types of projects is about 10 percent of the purchase of capacity, which is the main advantage of these projects. At the highest temperatures, this system has the highest efficiency, which is also an advantage. The social cost of power outage is much higher than the cost of generating electricity, and this shows the sensitivity of these schemes.

On the sidelines of the ceremony, Ali Azizi, director of the project on cooling air at the power plant of Mashhad announced that the implementation of all phases of engineering, supply, construction and installation in less than 3 months required detailed planning and also observance of the principles of project management.

August 1, 2017 More
Inauguration of the Renovation and Rehabilitation of the Steam Turbine of Shahid Beheshti Power Plant, Lowshan
News

Inauguration of the Renovation and Rehabilitation of the Steam Turbine of Shahid Beheshti Power Plant, Lowshan

Lowshan Shahid Beheshti Power Plant was launched in 1972. This complex is one of the thermal power plants with a production capacity of 360 MW, which includes two 60 MW gas units and two 120 MW steam units. Over the course of nearly 5 decades, the steam turbines have not been in good working condition since the continuous operation of this plant, turbine blades and shells have been corroded and fatigued over time, resulting in lower unit production capacity.

Mehrdad Ali Gholami, CEO of Lowshan Thermal Power Plant, on the sidelines of the opening ceremony of the localization project for the steam turbine of the plant, told reporters: "The power generation capacity of the Loshan Shahid Beheshti power plant units has been limited to 40 MW due to the burnout of devices in recent years, by using the localization capability to rehabilitate the steam turbine, we managed to return it to the amount of 120 megawatts. Gholamreza Mehrdad, General Director of the Technical Support Office of the mother company of the thermal electric power company, in this program, emphasized on the importance of implementing the project Rehabilitation and recovery of the existing production units, he also has pointed out that due to the investment restrictions and the lengthy time of implementation of the projects for the construction of new power plants, the way out of the shortage of electricity in peak periods consumes the most from the power and recovery of lost power in Power units are available.

In this regard, due to the lack of support of the foreign manufacturer of power plant equipment due to the large amount of equipment, a tender was held in 1395 by Loshan Power Company. Finally, in competitive conditions, with the presence of domestic and foreign competitors, TABA Engineering & Services Co. was selected as a rehabilitation contractor, using domestic specialists and utilizing renewed engineering and reverse engineering processes, with less than one-third the cost of similar foreign projects reached the stage of exploitation.

Ali Nikbakht, Managing Director of TABA Engineering & Services Co., said: "This project is based on the existing engineering, research, academic and manufacturing capacities in the country in three phases of engineering, assembling and installing parts on turbines for less than five months. And this is achieved only with the help of precise planning and management of the project as well as the pursuit of the supervisor of the employer. Therefore, it is ready to carry out similar projects with the aim of localizing the construction of components at other power plants of the country.

The engineering phase of this project involves various steps including measuring the dimensions of used parts and estimating their initial dimensions, analyzing and determining the metallurgical properties of blades and rims, drawing up three-dimensional models and building drawings, compiling a quality control and knowledge development casting, simulation, melting and vibration analysis. In this direction, the engineering and technical team of TABA Company, in cooperation with the new technologies Institute of Amir Kabir University of Technology, has been developing the necessary technical knowledge.

Majid Zarei, Member of TABA’s board of directors, said that the main challenge in this project was the lack of technical specifications and access to a sample of parts, which, in the course of time, was subject to major repairs and engineering documentation.

The construction phase of the project began with the development of shell fusions and turbine rings, as well as aluminum blades, and continued with casting operations at the domestic well-developed factories. The magnitude of shells, the volume of molten material, the control of mechanical properties , graining and the shape of the metallurgical structure have a special significance in obtaining favorable results. Managing director of the project, Manouchehr Shahmiri, said: "The machining of shells, despite the large dimensions, shards and blades, required high accuracy of adaptive telescope, which was carried out by all domestic experts." The assembly of new parts made at the turbine of the power plant was also carried out by the contractor in a very short time with the cooperation of the specialists of the Lowshan Power Management Company.

By implementing this knowledge-based project, the power of the steam generating unit of the Shahid Beheshti Power Plant, after the rehabilitation, has come to its forefront. The implementation of this project by TABA Engineering and Services Co., with the cooperation of more than 20 domestic industrial production units, related laboratories and universities, has been a reliable step towards achieving the objectives of resilient economy, production and employment. Dr. Hosseini, the head of the Faculty of Mechanics at Amir Kabir University, another speaker of the ceremony, referring to the memorandum of cooperation of the university with TABA, announced that the link between the university and the industry would enhance scientific and research capabilities and lasting measures. Asghar Agha Kusha, Director of the whole improvement of power plants and the environment and The parent company of Thermal Power Company stated at the end of the program that "It is hoped that the successful implementation of the rehabilitation project of the Lowshan power plant can serve as an efficient example of the rehabilitation culture in other power plants of the country thanks to the presence of capable contractors

January 9, 2017 More
V94.2 Life time extension & maintenance interval extension, December 13th, 2016 – Tehran
News

V94.2 Life time extension & maintenance interval extension, December 13th, 2016 – Tehran

TABA Engineering and Services Co., based on expert and experienced staff, developed systems, up-to-date techniques, adopts creative solutions and modern management approaches as a growing company in the energy sector both inside and outside the country. Based on this, the company, with its long-term vision, is organizing a workshop on "Improvement of utilization and maintenance Costs in the Turbine Life-cycle" at the 6th Conference of Users of Combined and Gas Combined and Gas V94.2 Units on Tuesday December 13th 2016 hosted by Damavand Electricity Management Company, in cooperation with the Association of Power Plants of the country (ASNA). Topics presented in collaboration with one of the company's partners and the research arm: Belgian engie Lab, a member of the engie group of multinationals (one of the largest privately owned power plants and power distributors in the world with a capacity of more than 113,000 megawatts in 72 countries) are as follow: 1. Evaluation of the remaining life of turbine components 2.Increasing the remaining life of turbine components 3. Increasing repair periods in the life cycle of turbines

It should be noted that the workshop was selected by the panel as the preferred workshop.

December 13, 2016 More
Sixteenth Exhibition of Power Industry
News

Sixteenth Exhibition of Power Industry

The international exhibition of Iran's power industry as the largest industrial and commercial event in this field, which is being held annually with the presence of a large number of powerful domestic and foreign companies in the field of electrical engineering, has been a great opportunity for companies active in this industry to achieve and extend their products to visitors and relevant specialists and based on the market demand and the direction of growth of this industry, direct their future activities and innovations. The 16th edition of the exhibition was held at the permanent site of Tehran's international exhibitions from 6th to 9th of November this year. It should be noted that TABA Engineering & Services Co., based on expert and experienced staff, system development, up-to-date techniques, creative solutions and modern management approaches is a growing company in the energy sector both inside and outside the country. It is a matter of fact. Accordingly, the company is also in line with its long-term vision, with the goal of implementing the above mentioned issues at the 16th Electrical Engineering Exhibition with one of the trading partners and the relevant foreign scientific and research arm: Engie Lab Belgium, member of the engie group of multinationals the largest private power plant and power distributors in the world with a capacity of more than 113,000 megawatts in 72 countries.

November 5, 2016 More
Inauguration of inlet air cooling systems of Shahroud power plant
News

Inauguration of inlet air cooling systems of Shahroud power plant

Managing director of Shahroud Power Generation Company in the ceremony of opening and exploitation of the cooling system of the air entering the gas turbines of Shahid Bastami Shahroud Power Plant, which was attended by the director of technical support and supervision of the production of power plants and provincial authorities: This cooling system was delivered by TABA Engineering and Services Co., with the capacity of domestic engineers and external consultants in less than six months, and even 45 days earlier than due date.

This modern cooling system is built by domestic engineers (TABA Company), Hashtgerd and Isfahan workshops and installed at Shahroud Power Plant and can greatly increase the power supply by utilizing it. Because the power lost through the heat in this system is minimized.

"The growth rate is higher than many developing countries," said the General Director of the Power Plant Support Office, saying that the electricity industry in our country has grown by 8% annually.

Gholamreza Mehrdad said: "The cost of the electric power industry is very expensive in the manufacturing sector and in the investment category, but with this Now, our colleagues in the electricity industry, with regard to resistance policies, are still struggling for the welfare of the people, and with domestic capacities are seeking to serve the people well. He appreciated TABA Co. as the designer and executor of the Shahid Bastami power plant cooling system and added that the system, which was launched by TABA Company with the advice of the German company Optima, has made it economical, in addition to increasing the power and efficiency of the power plant.

IFA Service TABA told the reporters: The project of the cooling system of the air inlet of the gas turbines with the evaporation method at Shahid Bastami Shahroud power plant, which is in the form of an EPC contract (engineering, supply and operation) was done by TABA Company and with the assistance of a European partner (Germany's Optimizer company), it was launched 138 days after the announcement, and thank God that today, in addition to being able to deliver the project 45 days earlier than expected, in terms of power boost, it has also been 30 percent more than the commitment.

Engineer Ali Nikbakht, regarding the operation of the project, said: "Since the V94.2 type gas turbines in the country during the summer have 0.7 of a decrease in power generation per degree of ambient temperature increase, this system helps reducing the turbine input temperature by the media method increasing turbine efficiency and power, which has been affected by the system for two turbine units installed at Shahroud power plant for about 35 megawatts in peak summer conditions.

Engineer Ali Azizi, project manager of Shahid Bastami power plant cooling system, said that economically, this project, in addition to its effectiveness in the electricity industry, has created nearly 7,000 day employed jobs in the country, accounting for 52 percent of the employment share Local in Shahrud and Semnan province. Its other feature is its cost-effectiveness as it is a very early return on the project, and the cost to build it is back in two summer seasons.

He added that the importance of this project, in addition to increasing production, is low investment, and if this type of project is not carried out in the country, it will require investment for the construction of new power plants, which will cost about ten times this system.

Member of the board of directors of TABA Engineering & Services Co., referring to the year of the resistance economy, said that this was perhaps one of the most operational projects in post-sanctions conditions, which by using technology transfer and domestication of this knowledge within the country and the maximum use of power Construction succeeded in reaching the desired result, and they further stated that the construction of concrete tanks, the construction of a reverse osmosis water treatment plant, as well as evaporation air coolers, were the three most important parts of the project, was successfully completed.

Engineer Majid Zarei added that the company based on two main strategies provides new power plant services with new ways and words, as the establishment of strategic partnership with foreign partners in the field of knowledge and development of work within the country and designing and operating the cooler of the company's portfolio of coolers Evaporation in the field of power plant, reverse engineering and manufacturing of power engineering parts, life cycle of products and equipment of power plants, engineering, supply and execution of renovation projects, as well as cooling and optimization projects the exploitation of powerhouses is done by the experience of experienced managers with engineering and management team of TABA services.

September 4, 2016 More