Engineering, procurement, and construction of 6 units of Gas Turbine Inlet-Air Cooling Systems
project name | Turbine type | project site | Client | Approximate Power Increase (MW) |
Engineering, procurement, and construction of 6 units of Gas Turbine Inlet-Air Cooling Systems | V94.2 | Shirvan Combined Cycle Power Plant | Production Management of Khorasan Gas Power Plants | 90 |
Description: The cooling project for two Ansaldo units in Shirvan power plant is the first evaporative cooling project of Taba company. After its construction and according to the satisfaction of the employer, two other units of the power plant were equipped with this system by Taba company. A clean water tank with a capacity of 500 cubic meters and a reverse osmosis treatment plant were also constructed for this purpose